Modify my search
Listed three days ago
  • Join a growing industry leader and be part of Australia's renewable future
  • Strong pipeline of major projects that is secured for decades to come
  • Join an in-house Design & Engineering Team consisting of over 200 experts
Join our Adelaide engineering team & build on your Revit skills, developing 3D structural models for renewable energy and high-voltage infrastructure.
3d ago
Listed fourteen days ago

This is a Full time job

Burleigh Heads, Gold Coast QLD(Hybrid)
$100,000 – $120,000 per year
Join our high-performing Gold Coast engineering consultancy delivering water, stormwater and civil infrastructure projects across Australia.
14d ago
Listed three days ago
  • Join a growing industry leader and be part of Australia's renewable future
  • Highly attractive remuneration package and development opportunities
  • Join an in-house Design & Engineering Team consisting of over 200 experts
Join our national Civil team, responsible for producing high-quality design drawings for renewable energy & high-voltage infrastructure.
3d ago
Listed two days ago

This is a Full time job

Mile End, Adelaide SA
$80,000 – $90,000 per year
Prepare civil engineering documentation that supports residential construction and property development projects.
2d ago
Listed eighteen hours ago

This is a Full time job

Brisbane QLD(Hybrid)
  • Work on diverse and complex building projects across various sectors
  • Flexible working arrangements and genuine career development opportunities
  • Join a nationally recognised Buildings team delivering projects across the state
Join Stantec's Buildings team in Brisbane and help deliver innovative health, education, commercial, defence and residential projects across the state
18h ago
Listed two days ago

This is a Full time job

Chatswood, Sydney NSW
Engineering consultancy firm with a history of over 90 years Inviting Civil Design Drafter with over 5 years experience
2d ago
Listed seven days ago

This is a Full time job

Bedford Park, Adelaide SA
$80,794 - $85,776 p.a. (Pro Rata)
  • Make an impact by helping improve essential healthcare infrastructure
  • Enhance your knowledge and competencies by using technologically advanced tools
  • Join the fastest growing Local Health Network in SA
Technical Drafting Officer role supporting healthcare infrastructure projects.
7d ago
Listed six days ago

This is a Contract/Temp job

Brisbane QLD(Hybrid)
  • Work on exciting road and transport infrastructure projects across Brisbane.
  • 50% WFH After Training
  • Join a leading local government organisation and make a real impact.
Bring your civil design expertise to life, shaping Brisbane's road infrastructure through innovative design and meaningful projects.
Recruited byTrinh Truong
6d ago
Listed two days ago

This is a Full time job

Brisbane QLD(Hybrid)
Excellent Salary + Super + SCI + Work-Life Balance
  • Flexible work arrangement within a sustainable, environmentally focused company
  • Significant forward workload on career defining and challenging projects
  • Opportunity to purchase additional leave and access to paid parental leave
We are seeking a Principal Civil Designer in Brisbane to provide technical expertise and lead teams delivering water and wastewater projects.
2d ago
Listed eight days ago

This is a Full time job

Perth WA
Competitive
  • International structural steel contractor and fabricator
  • Build and implement Digital Engineering capability across the organisation
  • Permanent staff role & competitive salary provided
Perth-based Digital Engineering Lead opportunity to to join the Australian arm of an international structural steel contractor and fabricator.
8d ago
Listed seven days ago

Be an early applicant

This is a Full time job

Sydney NSW(Hybrid)
Highly competitive salary + meaningful benefits
  • Work with diverse and collaborative teams in bringing ideas to life
  • Work on large and meaningful community enhancing projects
  • Be part of a collaborative organisation bringing ideas to life
Senior 12D Road Designer - Roads and Highways. This role can be based in either our Sydney, Newcastle, or Canberra office.
7d ago
Listed fourteen days ago

This is a Full time job

Plumpton, Sydney NSW
$80,000 per year
Join our growing team and contribute to exciting construction and infrastructure projects while building your career at Western Grammar School
14d ago
Listed thirteen days ago

This is a Full time job

Canberra ACT(Hybrid)
Base + Super + Salary Continuance Insurance
  • Ranked top 10 Sustainable companies globally by Corporate Knights 2025
  • Global consulting engineering company with strong ties with local community
  • We care about the communities we serve
Fantastic opportunity for Design and Drafting Team Leader, coordinates across disciplines, resolve technical issues and deliver projects efficiently
13d ago
Listed seventeen days ago

This is a Full time job

Perth WA(Hybrid)
  • West Perth Location
  • Growing team
  • Long term opportunities
Unique opportunity to gain exposure to projects within multiple markets including Transport, Mining and Renewable Energy
17d ago
Listed eight days ago

Be an early applicant

This is a Full time job

North Sydney, Sydney NSW(Hybrid)
Highly competitive salary + meaningful benefits
  • Work with diverse and collaborative teams in bringing ideas to life
  • Work on large and meaningful community enhancing projects
  • Be part of a collaborative organisation bringing ideas to life
Senior 12D Road Designer - Roads and Highways. This role can be based in either our Sydney, Newcastle, or Canberra office.
8d ago
Listed six days ago

This is a Full time job

Bassendean, Perth WA
$80,000 per year
Support end-to-end storage system projects through detailed civil engineering drafting and technical documentation.
6d ago
Listed twenty days ago
  • Diverse civil infrastructure and urban development projects
  • Collaborative, experienced multi-disciplinary engineering team
  • Career development opportunities within an established consultancy
Join WSce's Civil & Urban Engineering team. Work on diverse civil infrastructure and urban development projects in a collaborative consultancy.
20d ago
Listed twenty one days ago

This is a Full time job

Gold Coast QLD
$85,000 – $95,000 per year
Couple of years into drafting? Gold Coast civil role with council and private development work, plus a real path into 12d design.
21d ago
Listed twenty four days ago

This is a Full time job

Brisbane QLD
  • Bring complex industrial projects to life through practical, structural designs
  • Collaborate with engineers and designers across multidisciplinary project teams
  • Join a Best Place to Work 2026 (Australian Financial Review)
Bring structural designs to life on complex industrial projects, collaborating across disciplines while growing your technical capability.
24d ago•Expiring
Listed twenty seven days ago

This is a Full time job

Adelaide SA(Hybrid)
  • Join Ausenco's growing Adelaide team and work on exciting global projects.
  • Deliver innovative civil designs across mining and industrial projects.
  • Enjoy flexible working, career development and a supportive team culture.
Ausenco is expanding into South Australia! Join our growing Adelaide team as a Civil Designer and help deliver innovative projects.
27d ago•Expiring
Listed twenty eight days ago

This is a Full time job

Warabrook, Newcastle, Maitland & Hunter NSW(Hybrid)
  • Grow your career with mentoring, training and supportive leadership
  • Enjoy flexible working arrangements and a great work-life balance
  • Work on exciting mining projects with a global consultancy
Join Ausenco in Newcastle as a Civil Designer, delivering innovative civil design solutions across exciting mining projects.
28d ago•Expiring
Listed seven days ago

This is a Contract/Temp job

Brisbane QLD
Experienced Civil Drafter/Designer with exp in roads, rail or water infrastructure projects required for contract role
7d ago
Listed sixteen days ago

This is a Full time job

Chatswood, Sydney NSW(Hybrid)
  • Join a global leader in busduct and energy distribution systems
  • Work on landmark data centre and infrastructure projects
Design and deliver innovative busduct solution for major data centre, infrastructure and commercial projects in a growing global engineering business.
16d ago
Listed twenty one days ago

This is a Full time job

West Perth, Perth WA
Structural Designer to develop 3D models and drawings for mining and mineral processing EPCM projects using Autodesk Advance Steel and AutoCAD
21d ago
Listed sixteen days ago

This is a Casual/Vacation job

North Wollongong, Wollongong, Illawarra & South Coast NSW
$35 – $50 per hour
Drafter/Estimator role for a student or new entrant!
16d ago
Listed twenty four days ago
  • Flexible Working | Industry Benchmarked Salary Package | Annual Salary Reviews
  • Company culture that is respectful, inclusive and supportive
  • Employee owned Engineering Consultancy based in Brisbane
Join a reputable engineering consultancy that puts emphasis on career development. Take the lead on rewarding civil design projects across SEQ.
24d ago•Expiring
Listed twenty four days ago

This is a Full time job

Docklands, Melbourne VIC(Hybrid)
  • Work across defence, energy, water, aviation and transport project
  • Grow your expertise in digital design with teams across Australia.
  • Take ownership of complex designs and mentor junior designers.
Deliver civil designs across diverse infrastructure projects, grow your digital expertise and mentor junior designers in a collaborative team.
24d ago•Expiring
Listed twenty four days ago

This is a Full time job

Newcastle, Newcastle, Maitland & Hunter NSW
  • Brand new open office space located in Charlestown near gyms, shops and cafes
  • Flexible Working arrangements
  • A huge range of exciting projects
Looking to learn from some of the best drafters in Newcastle to launch your career? Join Northrop's local Newcastle team and build a long-term career!
24d ago•Expiring
Listed twenty four days ago

This is a Full time job

Melbourne VIC(Remote)
  • Fully remote role with a supportive international design team
  • Work on major infrastructure projects - North East Link, M5 West
  • Clear career pathway to lead the Australian design function
Remote drafting role on major bridge, rail & infrastructure projects, with a clear path to lead our Australian design team.
24d ago•Expiring
Listed twenty four days ago

This is a Full time job

Melbourne VIC
$60,000 – $90,000 per year
  • Opportunity to work across a diverse range of challenging projects
  • Genuine and long term career prospects
  • Vibrant, dynamic growing team within a boutique engineering consultancy
UDEC is a specialist utility engineering firm with a proven track record of delivering advanced capabilities through its experienced team.
24d ago•Expiring
Listed twenty nine days ago

This is a Full time job

Gold Coast QLD(Hybrid)
AUD 80000 - 100000 per annum
  • Eclectic mix of Engineering Design Projects
  • Flexible Working Arrangements
  • On-Going Design Training & Skills Developement
Leading Engineering & Design Consultancy Specialising In Renewables, Mining/Resources and Transportation Require a Design Drafter.
29d ago•Expiring
Listed twenty seven days ago

This is a Full time job

South Brisbane, Brisbane QLD
Great Remuneration + Salary Packaging + Benefits
  • We care about the communities we serve
  • Existing client relationship and busy pipeline of multi-disciplinary projects
  • Work for a global leader in engineering and environmental solutions
Are you a Senior SMP Designer? Join the Stantec - Energy & Resources team in Brisbane as we take on a major projects.
27d ago•Expiring
Modify my search
How relevant are your results?

Receive new jobs for this search by email

Return to search results
Modify my search

Select a job

Display details here